the wax room
the wax room
rubber mold
rubber mold
brushing in the wax
brushing in the wax
build it up
build it up
messy process
messy process
trim flush with mold
trim flush with mold
registration marks
registration marks
sprues and gates
sprues and gates
ready to demold
ready to demold
chasing the wax
chasing the wax
fussy bits
fussy bits
shrinkage
shrinkage
dip
dip
IMG_2604.jpg
IMG_2606.jpg
IMG_2608.jpg
IMG_2618.jpg
IMG_2610.jpg
IMG_2612.jpg
IMG_2615.jpg
IMG_3134.jpg
IMG_3135.jpg
IMG_3141.jpg
IMG_3157.jpg
IMG_3164.jpg
IMG_3165.jpg
IMG_3176.jpg
IMG_3178.jpg
IMG_3179.jpg
IMG_3217.jpg
IMG_3276.jpg
IMG_3317.jpg
IMG_3331.jpg
IMG_3346.jpg
IMG_3366.jpg
IMG_3370.jpg
IMG_3381.jpg
IMG_3382.jpg
IMG_3396.jpg
IMG_3398.jpg
IMG_3408.jpg
IMG_3461.jpg
IMG_3463.jpg
IMG_3483.jpg
IMG_3487.jpg
IMG_3496.jpg
IMG_3497.jpg
IMG_3499.jpg
IMG_3501.jpg
IMG_3502.jpg
IMG_3506.jpg
IMG_3508.jpg
IMG_3514.jpg
IMG_3516.jpg
IMG_3524.jpg
IMG_3529.jpg
IMG_3530.jpg
the wax room
the wax roomThe clean mold is wheeled into the wax room.  The microcrystalline wax is heated to two different temperatures in the vats to the left.  The hotter side is more fluid.
rubber mold
rubber moldThis is a close up of a portion of the rubber mold for the Alphabet Chair.  It has to be stapled together between pours to line it up properly.  Even the best molds suffer over time.  The seam will be carefully resculpted in the wax, prior to casting.
brushing in the wax
brushing in the waxUsing the hotter wax on the first coat, the wax is brushed onto the warmed surface of the mold.
build it up
build it upGravity is a bear, but the wax can be built up carefully with the slightly cooler wax.  You have to be mindful of not letting it cool too much between layers, though, as the wax can shear in layers when it's cool.
messy process
messy process...this is very time consuming, as the verticals run and drip.  The valleys are easier to build.
trim flush with mold
trim flush with moldWith a heat gun, the wax is warmed and scraped back to the level of the mold.  
registration marks
registration marksThe Chair is cast in seven pieces.  The main lines are where the the wax is cut, the crossing lines are used as a guide when welding the bronze sections back together.
sprues and gates
sprues and gatesThe ABC section of the Chair is sprued and gated.  These are the main and secondary channels that the molten bronze with ultimately flow through during casting.
ready to demold
ready to demoldThe waxes have been cut into their sections and have been fully sprued up.  Next comes the tricky part - demolding.  I'll spare you images and audio of this.  Sometimes things snap dramatically and need repairing.  
chasing the wax
chasing the waxNow each section is carefully checked for flaws, which there are plenty.  These bubbles, drips, nicks and bruises are painstakingly resculpted.  It's always easier to repair a wax than it is to repair bronze.
fussy bits
fussy bitsThis section of the Chair always needs attention.  The F (ferns) are dead center in the middle of the sculpture, and when I made the original, I couldn't reach that spot without kneeling on other finished areas of the sculpture.  It was a good lesson in planning ahead.  
shrinkage
shrinkageHere's a good photo that shows the shrinkage that occurs in the wax stage.  There's a 3-5% shrinkage in all between the original size of the sculpture and the final bronze casting.
dip
dip
IMG_2604.jpg
IMG_2606.jpg
IMG_2608.jpg
IMG_2618.jpg
IMG_2610.jpg
IMG_2612.jpg
IMG_2615.jpg
IMG_3134.jpg
IMG_3135.jpg
IMG_3141.jpg
IMG_3157.jpg
IMG_3164.jpg
IMG_3165.jpg
IMG_3176.jpg
IMG_3178.jpg
IMG_3179.jpg
IMG_3217.jpg
IMG_3276.jpg
IMG_3317.jpg
IMG_3331.jpg
IMG_3346.jpg
IMG_3366.jpg
IMG_3370.jpg
IMG_3381.jpg
IMG_3382.jpg
IMG_3396.jpg
IMG_3398.jpg
IMG_3408.jpg
IMG_3461.jpg
IMG_3463.jpg
IMG_3483.jpg
IMG_3487.jpg
IMG_3496.jpg
IMG_3497.jpg
IMG_3499.jpg
IMG_3501.jpg
IMG_3502.jpg
IMG_3506.jpg
IMG_3508.jpg
IMG_3514.jpg
IMG_3516.jpg
IMG_3524.jpg
IMG_3529.jpg
IMG_3530.jpg
info
prev / next